The robots are looking for anyone who can fix the source of the problems in the treatment plant, whatever they may be. As of 2287 however, the garden began to face problems with low water pressure and radiation contamination. For over two centuries, Graygarden has continued to operate thanks to the efforts of the robots. Water is drawn from the Weston water treatment plant and is used to cultivate crops, which are maintained by worker robots supervised by robots with superior cognition processes: Supervisors Brown, Greene and White. The facility was designed to be completely self sufficient. The Graygarden facility was built a scant few days before the Great War under the wishes of Doctor Edward Gray, a rather eccentric senior engineer of RobCo Industries.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |